• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Preparing The Type II (Liquid Fuel) Heater For Operation CONT. - TM-9-4520-257-12P_54
Assembling The Stack For H-45 Type II (Liquid Fuel) Heater Operation

TM-9-4520-257-12P Compressor Air Rotary Diesel Engine Driven Skid Mounted 125 cfm at 100 psi Manual
Page Navigation
  28    29    30    31    32  33  34    35    36    37    38  
    TM 9-4520-257-12&P                                                      0005 00 0005 00-17 10. Place the top heater shell (4) on the heater body base (8).  Place the bolt and wing nut assemblies (21) in the brackets (22) on the top heater shell (4) and tighten the wing nuts. 1 2 3 4 6 5 8 10 11 12 13 19 7 9 16 18 20 14 17 15 21 22 PREPARING THE TYPE II (LIQUID FUEL) HEATER FOR OPERATION 23







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.