TM 9-4520-271-14
0015 00
SERVICE UPON RECEIPT OF MATERIEL - Continued
Plastic Wrap
1.
Remove plastic wrap (1) and supply and return air hose assemblies shipping containers (2) from ASH (3).
WARNING
Steel bands under tension can snap free and cause injury to personnel. Leather gloves and face shield are
required.
2.
Cut steel bands (4) from ASH (3).
WARNING
ASH weighs 360 pounds (163.3 kg). Mechanical lift is required. For localized movement and positioning,
lower wheels and manually move ASH to desired location by utilizing handrails.
3.
Remove ASH (3) from skid (5). Save skid for reuse as required.
4.
Carefully open supply and return air hose assemblies shipping containers (2) and remove air hose assemblies (6). Save
containers for reuse as required.
Checking Unpacked Equipment
1.
Inspect the equipment for damage incurred during shipment. If the equipment has been damaged, report damage on
SF 361, Transportation Discrepancy Report.
2.
Check the equipment against packing slip to see if the shipment is complete. Report all discrepancies in accordance with
applicable service instructions (e.g., DA PAM 738-750).
3.
Check to see whether the equipment has been modified.
0015 00-5