T M 9 - 4 9 3 1 - 3 8 1 - 1 4 & P -2
FRAME 17
Install Connector W1J3:
1.
Cut ten l-inch pieces of insulation sleeving (1) with knife. Slip new sleeving (1) over
ten wires (2) and solder wires (2) to contacts. Refer to wiring chart, frame 23.
2. Slide insulation sleeving (1) over solder joints and using thermal gun, shrink
insulation sleeving (1).
3. Put connector W1J3 (3) on bracket (4) and screw in and tighten two new Iockwashers
(5) and nuts (6) with 1/8-inch wrench.
NOTE
If replacing connector W1J3 only, go to follow-on
maintenance, and TASK 10 ENDS HERE,
GO TO FRAME 18
Volume IV
2-188
Para. 2-8, Task 10