T M 9 - 4 9 3 1 - 3 8 1 - 1 4 & P - 2
FRAME 13
Replace Capacitor:
NOTE
Capacitor number is next to capacitor on chassis.
Read paragraph 2-4 on soldering before doing any work.
Remove Capacitor:
1.
Unsolder and take off capacitor (1) from terminal studs E8 (2) and E9 (3).
Install Capacitor:
2.
Wrap leads (4) of new capacitor (1) around terminals E8 (2) and E9 (3).
3. Solder leads (4) to terminals E8 (2) and E9 (3).
Follow-on Maintenance:
1. Install electrical load bank
2. Install thermal system test
3. Install thermal system test
TASK 8 ENDS HERE
A5; refer to task 16.
controller; refer to para. 2-5, task 8.
controller case cover; refer to volume 1, para. 4-18.
Volume IV
2-300
Para. 2-11, Task 8