T M 9 - 4 9 3 1 - 3 8 1 - 1 4 & P - 2
TASK 11. Replace Toggle Switch S1 or S8.
Applicability: All Models
Common Tools:
Knife, pocket
Screwdriver, flot tip
Set, soldering and desoldering
Wrench, combination, 9/16-inch
Special Tools: None
Supplies:
NOTE: Expendable supplies are defined in volume 1, appendix C.
Pencil, writing (Item 19)
Potting Compound (Item 20)
Solder (Item 29)
Switch (96906) MS24524-23 (S1)
Switch (96906) MS90311-271 (S8)
Tag, marker (as required) (Item 34)
ersonnel: One
P
Equipment Condition:
Thermal system test controller on a clean work surface.
Preliminary Procedures:
1. Remove thermal system test controller case cover; refer to volume 1, para. 4-17.
2. Remove thermal system test controlIer: refer to para. 2-5, task 2.
3. Remove panel assembly A1; refer to task 1.
Volume IV
Para. 2-6, Task 11