Home
Download PDF
Order CD-ROM
Order in Print
Figure 2-2. PMCS Routing Diagram
TABLE 2-1. Preventive Maintenance Checks and Services (PMCS) - TM-10-4520-259-13P_32
TM-10-4520-259-13P Heater Water Liquid Fuel M-80 M-85 Manual
Page Navigation
14
15
16
17
18
19
20
21
22
23
24
TM 10-4520-259-13&P
TABLE 2-1. Preventive Maintenance Checks and Services (PMCS)
Water Heater M-80 and M-85
Location
Item
Interval
Item To
Procedure
Not Fully Mission
No.
Check/Service
Capable If:
1
Before
Water
Inspect overall water
Water heater is
Heater
heater for signs of
damaged.
obvious damage.
NOTE
Valve closes clockwise
Valve opens counterclockwise
2
Before
Fuel
Place valve in OPEN
Valve catches
Shutoff
position. Check for
or binds during
Valve
catching or binding.
rotation.
After
Fuel
Place valve in CLOSE
Valve catches or
Shutoff
position. Check for
binds during
Valve
binding or catching.
rotation
2-10
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business