TM 10-4520-259-13&P
Section VI
Preparation for Storage and Shipment....................................................................
4-56
4-24
Special Instructions for Administrative
Storage................................................................................................
4-56
4-25
Long Term Storage and Shipment.......................................................
4-57
SECTION I.
REPAIR PARTS; TOOLS; SPECIAL TOOLS; TEST MEASUREMENT AND
DIAGNOSTIC EQUIPMENT (TMDE); AND SUPPORT EQUIPMENT.
4-1.
COMMON TOOLS AND EQUIPMENT.
For authorized common tools and equipment, refer to the Modified Table of Organization and Equipment
(MTOE), CTA 50-970, or CTA 8- 100, as applicable to your unit.
4-2.
SPECIAL TOOL, TMDE, AND SUPPORT EQUIPMENT.
No special tools or support equipment are required for the maintenance of the water heater. Test equipment
requirements for heater maintenance are listed in Section III., Appendix B, Tool and Test Equipment List.
4-3.
REPAIR PARTS.
Repair parts for the water heater are listed and illustrated in Appendix C, Repair Parts and Special Tools-List.
SECTION II. SERVICE UPON RECEIPT
4-4.
UNPACKING.
Unpack the water heater as described in paragraph 2-8.
4-5.
INSPECTING UNPACKED WATER HEATER.
a.
Inspect water heater for damage sustained during shipment. If damage is found report it on
SF 364, Report of Item Discrepancy.
b.
Check the unpacked equipment against the packing slip to see if the shipment is complete.
Report all discrepancies in accordance with instructions in DA PAM 738-750.
c.
Check to see if the water heater has been retrofitted with the 110 V transformer as
described in paragraph 1-14.
4-2