Operator/Crew Preventive Maintenance Checks and Services
B-Before
D-During
A-After
W-Weekly
M-Monthly
Interval
ITEM TO BE INSPECTED
FOR READINESS REPORTING
Item
Procedure: Check For And Have Repaired,
Equipment is Not Ready
No. B D A W M
Filled or Adjusted As Needed Available If:
(1) Hot oil temperature gauge (1000 to 4500F)
(2) Hot oil pressure gauge (7 to 50 PSI)
(3) Fuel oil pressure gauge (O to 600 PSI)
(4) Liquid level sight gauge (nearly full)
(5) Temperature controller (set by operator)
7.
PUMP DRIVE COUPLING
Check for loose hardware.
F-4