TM 5-4520-244-14
4-11 DUCTS, ADAPTER, BASKET AND SUPPORT HANDLE
This task covers:
a.
Removal
c.
Installation
Inspection
b.
INITIAL SETUP
Test Equipment
References
None
Materials/Parts
Equipment Condition
Completely assembled
Serviceable replacement parts
Personnel Required
1
ITEM
LOCATION
ACTION
REMARKS
REMOVAL
Ducts (1),
Lift from holders (11)
a.
1.
Ducts
and basket (7)
(2)
and
adapter.
b.
Adapter (3)
Remove from basket
(7)
Holders (11)
Remove nut (8)
2.
Duct
holders
Washer (9) and
Screw (10) from
holders (11).
Remove holders (11)
Remove nuts (12),
Basket
Basket (7)
3.
washers (5) and
J-bolts (6).
Remove basket (7)
Handle (15)
Remove nuts (12),
4.
Handle
washers (13) and
assembly
screws (14).
Lift handle (15) from
socket in frame (16)
INSPECTION
Unlock duct clamps, extend ducts to full length and examine for holes and
damaged adapter ends.
Examine all parts for serviceable condition. Replace all broken, damaged
or worn out parts with a serviceable like item.
4-12