TM 5-4520-244-14
4-19 CONTROLS AND INSTRUMENTS
This task covers:
a. Removal
Installation
c.
b.
Testing
INITIAL SETUP
Test Equipment
References
None
Materials/Parts
Equipment Condition
None
Hood Assembly Removed
Personnel Required
Engine Removed
1
LOCATION
lTEM
ACTION
REMARKS
REMOVAL
Control box
Remove screws
1.
a.
(10)
(9), screws (2),
nuts (1), lock-
washers (3),
washer (4).
Remove control
box (10),
b.
Remove screws
(2), nuts (l),
lock washers
(3), washer (4),
Remove door (5)
from control box(l0),
Lines and
2.
Disconnect
Remove fitting only
a.
Tubes
lines (29).
if' necessary
Remove line from
heater.
Remove elbows
b.
(27) a n d ( 2 8 ) .
Remove tube
a s s e m b l y from
bulkhead
4-34