TM 5-4520-256-14
3-17.
combustion control relay (K8) MAINTENANCE-Continued.
e.
Installation.
(1)
Install relay (8) and secure with four self-locking nuts (7), four flatwashers (9), and four screws (10) to
bracket (5).
(2)
Place relay bracket (5) into position and secure with four flat washers (3), four lockwashers (2), and four
screws (1).
(3)
Connect connector (6) to relay (5).
(4)
Install access door per para 3-10d.
3-46