TM 5-4520-256-14
4-5. CONTROL PANEL MAINTENANCE - Continued.
e. Installation.
(1)
Place control panel (1) into position.
(2)
Install six flat washers (2), six lockwashers (3), and six screws (4).
(3)
Install INTERNAL TANK/EXTERNAL TANK per para 3-22d.
(4)
Install rectifier per para 3-21e.
(5)
Install ON/OFF toggle switch S7 per para 3-20d.
(6)
Install circuit breaker (CB1) per para 3-19e.
(7)
Install audible alarm (EM1) per para 3-18d.
(8)
Install combustion control relay (K8) per para 3-17e.
(9)
Install hourmeter per para 3-16d.
(10)
Install fuel pressure gage per para 3-15d.
(11)
Install OFF/VENT/HEAT switch (S1) per para 3-14e.
Figure 4-3. Control Panel, Installation.
4-10