TM 9-4520-257-12&P 0029 00
0029 00-2
Table 1. Unit Preventive Maintenance Checks and Services for H-45
Type I (Solid Fuel) and Type II (Liquid Fuel) Heaters - Continued
Item
No.
Interval
Item to be
Checked
or
Serviced
Procedure
Equipment
Not Ready/
Available If:
2
Quarterly
Burner
Assembly
Inspect street elbow fitting (1) and
reducer bushing (2) for soot buildup
or fuel residue.
Inspect pipe nipple (3) for crimping
or bends that restrict fuel flow and
soot buildup. Replace pipe nipple
(3) as required.
Elbow is clogged
Fuel flow is restricted.
LUBRICATION REQUIREMENTS
The door hinge, door latch assembly, and sight glass cover should be lubricated with a light machine oil
when stored.
END OF WORK PACKAGE
3
2
1