TM 9-4520-271-14
0046 00
PREPARATION FOR MOVEMENT
Continued
ADMINISTRATIVE STORAGE
Placement of equipment in administrative storage should be for short periods of time when a shortage of maintenance effort
exists. Items should be in mission readiness within 24 hours or within the time factors as determined by the directing
authority. During the storage period, appropriate maintenance records will be kept. Before placing equipment in
administrative storage, current PMCS should be completed, shortcomings and deficiencies should be corrected, and all
Modification Work Orders (MWOs) should be applied. Inside storage is preferred for items selected for administrative
storage. If inside storage is not available, trucks, vans, conex containers, and other containers may be used.
0046 00-3