TM 9-4520-272-14&P
0092 00
Table 1. Maintenance Allocation Chart (MAC) for Large Capacity Field Heater (LCFH).
(6)
(5)
(3)
(2)
(1)
(4)
MAINTENANCE LEVEL
TOOLS AND
FIELD
SUSTAINMENT
REMARKS
EQUIPMENT
MAINTENANCE
COMPONENT/
GROUP
DIRECT
GENERAL
CODE
REF CODE
FUNCTION
ASSEMBLY
NUMBER
UNIT
SUPPORT
SUPPORT
DEPOT
C
O
F
H
D
08
ASSEMBLY,
Replace
.5
2
MAIN CONTROL
BOX
A
.1
Inspect
ASSEMBLY,
09
2
.5
Repair
OPERATOR
2
.2
Replace
CONTROL BOX
Inspect
.1
A
0901
ASSEMBLY,
Test
.4
7
OPERATOR
Replace
.2
2
CONTROL BOX
CABLE
0902
DETECTOR, CO
Inspect
.1
A
OPERATOR
Test
.1
A
CONTROL BOX
Replace
.3
2
A
.1
Inspect
10
AIR DUCT,
.2
Remove
INSULATED, 16
.1
Repair
IN. X 15 FT.
11
DUCT COVERS
Inspect
.1
A
0092 00-6