TM 9-4540-202-12&P
2-4. OPERATING PROCEDURES - Continued
(11)
Wash the exterior of the smokestack sections with a brush (Item 9, Appendix E) and hot water.
(12)
Dry the smokestack sections thoroughly. Do not apply paint to the smokestack sections.
(13)
Inspect the smokestack for holes, dents, and excessive rusting conditions. Replace the sections as
required.
(14)
Remove heater from corrugated can or tank and turn upside down to catch the burner assembly from the
burner compartment and also allow any accumulated fuel in the combustion chamber to drain out.
d.
After Shutdown. Perform preventive maintenance checks and services described in Table 2-1.
2-5. PREPARATION FOR MOVEMENT
a.
Short Distance.
(1)
Remove smokestack assembly and separate into sections.
(2)
Remove fuel tank from heater.
(3)
Wipe heater dry and dean soot from smokestack and burner.
(4)
If unit is being moved to another space in the same area it can be hand carried.
b.
Long Distance.
(1)
Provide a suitable container for the unit. Refer to TM 38-230-1 for instructions in container fabrication.
(2)
Provide suitable blocking and tiedown to prevent the unit from shifting during transport.
c.
Installation After Movement. Installation instructions are essentially the same as outlined in Paragraph 2-3.
2-15
