TM 5-3895-377-13&P
4-84. VALVE NO. 2 REPLACEMENT (CONT).
(2)
With the aid of an assistant, position gasket (
18), plate 14), eight screws (13), eight lock
washers (12), nuts (11), and plumbing section
(1) on valve no. 2 (15). and plumbing section
(1). Do not tighten nuts.
(3)
Position gasket (17), four screws (9), lock
washers (8), and nuts (7) in plumbing sections
(10 and 1). Do not tighten nuts.
(4)
Position gasket (16), eight screws (4), plate 5}),
lock washers (3), and nuts (2) In valve no. 3 (6)
and plumbling section (1).
(5}
Tighten nuts (2, 11, and 19) to 110 lb-ft (149
N.m) t6) Tighten nuts (7) to 55 lb-ft (75 N.m).
NOTE
Follow-on Maintenance:
Fill expansion tank with oil (page 3-
14).
Remove wheel chocks (page 2-35).
END OF TASK
4-212