TM 5-3895-377-13&P
NOTE
Be sure the shaft can rotate freely. If
not, back off additional notches and
check again.
(19) Install split packing gland (16), two clips (18),
packing gland screws (17), and spring wire
retainer (19) on pump (15).
(20) Install pair of half circle, round wire rings (13) in
the groove of shaft (10) and slide the shaft
forward: the rings seat into inner bearing spacer
collar (27).
NOTE
Ensure the packing gland is installed
square and nuts are tightened evenly.
(21) Install packing gland nuts (11) on packing gland
screws (12).
(22) Tighten nuts until rotor shaft becomes difficult to
turn and then back off until gland is slightly
loose.
5-82