• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ASSEMBLY - TM-9-4520-271-140329
INSTALLATION cont'd - TM-9-4520-271-140331

TM-9-4520-271-14 Improved Army Space Heater (IASH) Electric Powered Multi-fuel 140 000 BTU Model H-140 Manual
Page Navigation
  274    275    276    277    278  279  280    281    282    283    284  
TM 9-4520-271-14
0035 00
INSTALLATION
1.
Carefully guide two high-tension leads (8) into heat exchanger shell (17) and install ignition transformer assembly (16).
2.
Position ignition transformer assembly (16) and install with two screws (15), four washers (14), two lockwashers (13)
(item 27, WP 0062 00), and two nuts (12).
3.
Connect two wires (10) onto capacitor (11). Remove wire marker tags.
4.
Install wire ties as required.
5.
Twist two high-tension leads (8) together three turns and connect to electrodes (9).
6.
Install gasket (7) onto cover plate (6).
7.
Install cover plate (6), braided wire (5), thermostat bracket assembly (4), eight washers (3), lockwashers (2) (item 33,
WP 0062 00), and nuts (1).
0035 00-6






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.