TM 10-4520-262-12&P 0005 00 SPACE HEATER, CONVECTIVE (SHC) OPERATION UNDER USUAL CONDITIONS 0005 00-1 PREPARATION FOR USE Unpacking and Inspection Upon Receipt.Inspect containers and packaging upon receipt for evidence of damage occurring in shipping. The heater package and its accessories were carefully inspected and securely packaged prior to shipment. If damage to the containers or packaging is found it is the shipper’s responsibility. Do not unpack a heater that is obviously damaged in shipment until the shipper is notified and has inspected the packaging. Notify your supervisor. Remove heater package and accessories from shipping containers and packaging. Inspect the heater package and accessories for completeness by comparing the contents against the description of the equipment found in the Components of End Item work package of this technical manual. NOTE Heater will not operate when tilt or grade is greater than 15 degrees, which is a 1.5 foot drop over a 10-foot span. SPACE HEATER CONVECTIVE (SHC) TENT WALL MODIFICATION KIT (TWMK) INSTALLATION In order to operate the Space Heater, Convective with the Command Post Shelter, tent duct tunnels must be present on one of the walls of the tent. The installation of the tent duct tunnels must be performed before using the Space Heater, Convective. If these tunnels are not present on the shelter, the tent wall modification kit (NSN 4520-01-493-3215, Part Number 5-13-5627, CAGEC 92878) must be applied to the tent. Complete instructions for the installation of the tent wall modification are contained in the following section. Tools Required: Cutting Tool (knife or razor blade). Marking Tool (pen, pencil, or marker). Philips Screwdriver. Punch (if available). Components included with kit: 4 retaining rings [2 Cuff Rings (with fabric attached) and 2 Plain Rings]. 9 bolts & 9 nuts.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business