TM 10-7310-241-12&P
Change 1 4-22.23/(24 blank)
Section VI. PREPARATION FOR STORAGE OR SHIPMENT
4-17. SPECIAL INSTRUCTIONS FOR ADMINISTRATIVE STORAGE
a. Administrative Storage. Placement of equipment in administrative storage should be for short periods
of time when a shortage of maintenance effort exists. Items should be mission ready within 24 hours or
within the time frame as determined by the directing authority. During the storage period, appropriate
maintenance checks and services should be completed, shortcomings and deficiencies should be
corrected and all Modification Work Orders (MWOs) should be applied.
b. Storage Site Selection. Inside storage is preferred for items selected for administrative storage. If
inside storage is not available, trucks, vans, conex containers, or other containers may be used.
4-17. PREPARATION FOR USE
To prepare the HWR for storage, perform the inspection, cleaning, and sanitizing procedures described in
Chapter 3, Section III, Subparagraph 3-5, 3-6, and 3-7.
4-18. PREPARATION FOR SHIPMENT
Prepare the HWR for shipment by packing it into the original, or similar, packaging and container in which it
was received.