TM 5-4520-256-14
3-29.
POWER CABLE ASSEMBLY MAINTENANCE continued.
NOTE
Sleeving (12) is three inches in length cut from insulation sleeve P/N M23053/5-109-0.
(l) Slide insulation sleeving (12), cable clamp (11), rubber bushing (8), grommet follower (7), grommet (6),
and sleeve assembly (4) down cable.
(m) Strip .75 inch of insulation from cable (17) to expose three insulated conductor wires.
(n) Strip .25 inch of insulation from each insulation conductor wire and solder into connector plug (2) pins as
follows:
Wire
P/N
Black (hot)
A
White (neutral)
B
Green (ground)
C
(o) Hold connector plug (2) tight and slide sleeve assembly (4) up cable (17) then screw onto connector plug
(2).
NOTE
Holding connector plug (2) and turning sleeve assembly (4) will prevent twisting of conductor
wires.
(p) Slide grommet (6), grommet follower (7), rubber bushing (8), and clamp (11) up cable (17).
(q) Hold sleeve assembly (4) tight and screw clamp (I 1) onto sleeve assembly (4).
(r) Attach saddles (10) to clamp (11) with screws (9) and tighten until cable (17) is secured. The rubber
bushing (8) should bulge slightly when saddles are tight. There should be no flexing of the cable ( 17)
with the saddles ( 10) tightened.
(s) Slide insulation sleeving (12) up cable (17) over rubber bushing (8) and up next to back of clamp (11).
Apply heat (250°F - 300°F) to shrink sleeving (12).
(t) Insert strap (3) through end of chain on cover (1) and secure onto connector plug (2).
(u) Screw cover (1) into connector plug (2).
3-86.6 Change 3
