TM 5-4520-256-14
5-3. CABINET ASSEMBLY AND SKID MAINTENANCE - Continued.
a.
Removal.
(1)
Remove thirty-one screws (5), thirty-one lockwashers (6), and thirty-one flat washers (7).
(2)
Remove screw (4), lockwasher (3), flat washer (2), and duct cover assemblies (1).
(3)
Remove stacking screw (10) from top hole and screw into side holes.
(4)
Install 3/8-16 threaded lifting eye (11) in top four stacking screw holes.
(5)
Attach a sling, capable of lifting 225 lb (101. 3 kg) to each lifting eye (11).
NOTE
Silastic adhesive is used around fuel level gage hole. Use a flat tip blade screwdriver and pry
cabinet assembly loose from fuel tank.
(6)
Attach a lifting device capable of lifting 225 lb (101. 3 kg) and remove cabinet assembly (8) from skid
(9).
5-4