T M 9 - 4 9 3 1 - 3 8 1 - 1 4 & P - 2
F R A M E 24
Install Electrical Card Holder:
1.
Line up holes in holder (1) with holes in digital subsystem assembly (2).
2. Screw in and tighten three machine screws (3), new Iockwashers (4), and flat
(5) with screwdriver.
Follow-on Maintenance:
1. Install thermal system test controller; refer to para. 2-5, task 8.
washers
2. Install thermal system test controller case cover; refer to volume 1, para. 4-18.
END OF DIGITAL SUBSYSTEM (DSS) A3 MAINTENANCE
2-160
Volume IV
Para. 2-7, Task 20