T M 9 - 4 9 3 1 - 3 8 1 - 1 4 & P -2
FRAME 21
Install Switch (Continued):
NOTE
l
Read paragraph 2-40 on togging and soldering wires and
switches before doing any work.
l
Use this wiring chart for reference only.
1.
Solder eight wires (1) to switch (2).
Wiring Chart for Switch S9, S10, S11
From
S9A-2
S9A-C1
S9A-3
S9A-C2
S9A-2
S9A-9
S9B-C1
S9B-3
S9B-8
S9B-9
S9B-C2
S9B-C1
S9C-2
S9C-3
To
A1P3-22
S10A-C1
A1P3-21
S10B-C1
A1P3-22
S2-1C
S9B-C2
A1P3-43
S9B-9
A1P3-42
A1P1-25
S9C-C2
S9C-3
A1P4-21
From
S9C-9
S9C-C2
S10A-C1
S10A-C1
S10A-1
S10A-2
S10A-3
S10A-4
S10A-5
S10A-9
S10A-C2
S10A-C2
S10B-1
S10B-3
To
A1P4-22
A1P4-18
S9A-C1
A1P3-38
A1P3-23
A1P3-24
A1P3-25
A1P3-26
A1P3-27
A1P3-28
S9A-9
TB1-37
S10B-3
S10B-5
From
S10B-5
S10B-7
S10B-7
S10B-8
S10B-9
S10B-10
S10B-C2
S11-1
S11-2
S11-3
S11-4
S11-5
S11-6
S11-7
To
A1P3-29
R5-W
S10B-8
S10B-9
S10B-11
R5-CW
A1P3-10
A1P2-L1
A1P2-L2
A1P2-L3
A1P2-L4
A1P2-L5
A1P2-L6
A1P2-L7
Follow-on Maintenance:
1. Install switch knob; refer to task 22.
2. InstalI panel assembly A1; refer to task 26.
3. Install thermal test controller; refer to para. 2-5, task 8.
4. Install thermal system test controller case cover; refer to volume 1, para. 4-18.
TASK TO END SHERE
Volume IV
2-62
Para. 2-6, Task 10