T M 9 - 4 9 3 1 - 3 8 1 - 1 4 & P -2
TASK 12. Replace Light-Switch DS2, S2, S3, S4, S5, S6, or S7.
Applicability: All Models
Common Tools:
Knife, pocket
Screwdriver, flat tip
Set, soldering and resoldering
Special Tools: None
Supplies:
NOTE: Expendable supplies are defined in volume 1, appendix C.
Light-Switch (19200) 12303306 (DS2)
Light-Switch (19200) 12303301 (S2)
Light-Switch (19200) 12303302 (S3)
Light-Switch (19200) 12303303 (S4)
Light-Switch (19200) 12303304 (S5)
Light-Switch (19200) 12303305 (S6)
Light-Switch (19200) 12303295 (S7)
Pencil, writing (Item 19)
Solder (item 29)
Tag, marker (as required) (Item 34)
Tape, lacing (as required) (Item 35)
Personnel: One
Equipment Condition:
Thermal system test controller on a clean work surface.
Preliminary Procedures:
1. Remove thermal system test controller case cover; refer to volume 1, para. 4-17.
2. Remove thermal system test controller; refer to para. 2-5, task 2.
3. Remove panel assembly Al; refer to task 1.
Volume IV
Para. 2-6, Task 12
2-67
