TM 10-7310-241-12&P
Change 1 2-18.1
2-9. OPERATING PROCEDURES FOR MODEL RAK-15 (Continued)
(19) If further operation is not required, perform step (1) and then steps (9) thru (11).
2-9.1 OPERATING PROCEDURES FOR MODEL 471012
a. Heating Water.
(1) With switch at "0" (1), remove inner container (2) and fill main container (3) with potable water, to the
upper fill line (4).
(2) Close the lid (1) and use the latches (2) to secure the HWR. Move the switch (3) to position "ll". Both
the indicator lights (4) will illuminate.
1
2
3
4
5
1
2
3
4