TM 5-3895-377-13&P
NOTE
Apply compound (item 7, appendix E) to studs.
(4)
Using a lifting device, and with the aid of an assistant, install front service plate (11) with sixty-five washers
(10), lock washers (9), and nuts (8). Tighten nuts in sequence shown to 10 -12 lb-ft (14-16 Nm).
WARNING
Protective
equipment
(gloves,
goggles, ventilation mask) must be
worn
when
removing/installing
insulation; breathing the insulation
can be harmful to personnel.
(5)
Install eight pieces of insulation (6) on heat
exchanger (7).
(6)
Bend three wires (5) up to hold insulation
(6) in place.
4-291