TM 5-3895-377-13&P
4-101.
COMBUSTION CHAMBER LINER REPLACEMENT (CONT).
c.
Installation.
WARNING
To avoid personal injury, use a
hoist or get assistance when lifting
components that weigh more than
50 lbs (23 kg). Ensure all chains,
hooks, slings, etc., are in good
condition
and
are
of
correct
capacity.
Ensure
hooks
are
positioned correctly. Always use a
spreader bar when necessary. The
lifting hooks must not be side
loaded.
NOTE
Combustion
chamber
liner
weighs 70 lb (32 kg).
Position chamber liner as
noted during removal.
(1)
Using a lifting device, install combustion
chamber liner (13) in heat exchanger (7).
(2)
Install insulation (12) on heat exchanger (7),
pressing insulation over studs. Trim edges.
(3)
Cut hole in insulation (12) to match center
hole in combustion chamber liner.
4-290