TM 5-3895-377-13&P
2-17.
PREPARATION FOR MOVEMENT (CONT).
NOTE
Ensure that all leveling screw jacks are in stowed position.
(7)
Remove pin (9) from front screw jack (10) and allow screw jack to pivot down.
(8)
Install pin (9) in screw jack (10).
(9)
Remove sand pad from stowage box and position it under screw jack (10).
(10)
Turn handle (11) until base of screw jack (10) rests in sand Dad.
(11)
Back towing vehicle to Heater and aline pintle hook (12) and lunette eye (13) using screw jack
(10)
to raise or lower lunette eye.
(12)
Remove cotter pin (14) from pintle hook (12).
(13)
Pull latch (15) away from vehicle and hold.
(14)
Lift top of pintle hook (12) and let go of latch (15). Pintle hook will be locked open.
2-44