TM 5-3895-377-13&P2-17.PREPARATION FOR MOVEMENT (CONT).(29)Remove 24 Vdc intervehicular cable (30) from stowage box.(30)Lift cover (31) fully and slide catch (32) forward until cover is locked in open position. Repeat step for the otherend of cable.(31)Lift cover (33), aline keyway with key, and connect 24 Vdc intervehicular cable (30) to connector (34) on Heater.(32)Lift cover (35), aline keyway with tab, and connect 24 Vdc intervehicular cable (30) to connector (36) on towingvehicle.(33)Turn handle (11) until screw jack (10) is fully retracted.(34)Place sand pad in stowage box.(35)Remove pin (9) and position screw jack (10) in stowed position.(36)Install pin (9) in screw jack (10).2-48
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business