TM 5-3895-377-13&P
2-17.
PREPARATION FOR MOVEMENT (CONT).
(24)
Turn handle (11) until screw jack (10) is fully retracted.
(25)
Place sand pad in stowage box.
(26)
Remove pin (9) and position screw jack (10) in stowed position.
(27)
Install pin (9) in screw jack (10).
c.
Preparation for Movement by Rail.
(1)
Remove eight screws (1), lock washers (2), and nuts (3) from stowage box.
(2)
Install eight screws (1), lock washers (2), and nuts (3) in heat exchanger (4), spacer (5), and frame (6). Tighten
nuts.
d.
Preparation After Movement by Rail
(1)
Remove eight screws (1), lock washers (2), and nuts (3) from heat exchanger (4), spacer (5), and frame (6).
(2)
Place eight screws (1), lock washers (2), and nuts (3) in stowage box.
2-52