MOUNTING ASSEMBLY - ESPAR V7S
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Tools
Personnel Required
Tool Kit, Mechanics Gen (Item 1, Appendix B)
63G
Materials/Parts
Tags, marking (Item 9, Appendix C)
LOCATION
ITEM
ACTION
REMARKS
NOTE
Tag all wires, terminals, and connectors to aid during installation (page 2-3).
1.
2.
3.
4.
5.
6.
7.
8.
9.
Temperature sensor (1)
Two mounts (3) and
bracket (4)
Two mounts (3)
Clamp (7)
Bracket (9)
Bracket (9) and two mounts (3)
Bracket (9)
Bracket (9) and two
connector receptacles (12)
Bracket (9)
10. Semiconductor (16) and
lead (17)
11. Bracket (9)
12. Two clamps (20)
13. Circulating pump (22)
14.
Connector (2)
Two nuts (5) and washers (6)
Mounting bracket (4)
Screw (8)
Clamp (7)
Two nuts (1 O) and washers(11 )
Two mounts (3)
Eight screws (13), nuts (14),
and washers (15)
Two connector receptacles (12)
Nut (18) and washer (19)
Semiconductor (16) and lead (17)
Two screws (21)
Two hoses (23) with clamps (20)
Two connectors (24)
Remove.
Unscrew and remove.
Remove.
Unscrew and remove.
Remove.
Unscrew and remove.
a. Remove.
b. Repeat steps 2 through 7a for
other side.
Unscrew and remove.
Remove.
Unscrew and remove.
Remove.
Unscrew and remove.
Remove.
Remove.
3-163
TM 9-2540-205-24&P
R E M O V A L
