TM 9-4540-202-12&P
3-5. IMMERSION HEATER - Continued
NOTE
Install burner with the vaporizer plate facing up.
b.
Smokestack. Operator/crew maintenance procedures include service, replacement and installation.
(1)
Disassembly. Separate the four 2-foot sections of smokestack, by pulling pipes apart at each joint
(Figure 3-4).
Figure 3-4. Immersion Heater Smokestack Removal and Installation
3-8