TM 9-4540-202-12&P
B-3. COLUMN ENTRIES USED IN THE MAC - Continued
This time includes preparation time (including any necessary disassembly/assembly time), troubleshooting/fault
location time, and quality assurance/quality control time in addition to the time required to perform the specific
tasks identified for the maintenance functions authorized in the maintenance allocation chart. The symbol
designations for the various maintenance categories are as follows:
C ..................
Operator or Crew.
O .................
Unit Maintenance.
F ..................
Direct Support Maintenance.
H ..................
General Support Maintenance.
D .................
Depot Maintenance.
e.
Column 5 - Tools and Equipment. Column 5 specifies, by code, those common tool sets (not individual tools)
and special tools, test, and support equipment required to perform the designated function.
f.
Column 6 - Remarks. This column shall, when applicable, contain a letter code, in alphabetical order, which
shall be keyed to the remarks contained in Section VIII.
B-4. COLUMN ENTRIES USED IN TOOL AND TEST EQUIPMENT REQUIREMENTS
Not required for this equipment.
B-5. EXPLANATION OF COLUMNS IN SECTION III
a.
Reference Code. The code recorded in column 6, Section II.
b.
Remarks. This column lists information pertinent to the maintenance function being performed as indicated in the
MAC, Section II.
B-3
