TM 9-4931-381-14&P-2
FRAME 41
Remove Bow Handle and Extension Handle:
NOTE
Use this task to replace any of four bow handles (1) and
extension handles (2).
1.
Unscrew and take out two machine screws (3) with screwdriver.
2. Unscrew and takeoff two extension handles (2) from bow handle
InstalI Bow Handle and Extension Handle:
(1).
3. Screw on and tighten two new extension handles (2) to bow handle (1).
4. Line upholes in new bow handle (1) and new extension handles (2) with holes in panel
(4).
5.
Screw in and tighten two screws (3) with screwdriver.
Follow-on Maintenance:
1. Install panel assembly A1; refer to task 26.
2. install thermal system test controller; refer to para. 2-5, task 8.
3. install thermal system test controller case cover; refer to volume 1, para. 4-18.
TASK 19 ENDS HERE
ARR82-24326
Volume IV
2-92
Para. 2-6, Task 19