T M 9 - 4 9 3 1 - 3 8 1 - 1 4 & P - 2
F R A M E 4 4
Install Terminal Lug:
1.
Position new
2.
Screw in and
and 1/4-inch
3.
Screw in and
electrical-mechanical post (1) on back of panel assembly (2).
tighten screw (3), new Iockwasher (4), and washer (5) with screwdriver
wrench.
tighten
with screwdriver.
4.
Solder wires back to
Follow-on Maintenance:
screw (6), new Iockwasher (7), washer (8), and terminal lug (9)
new terminal lug (9).
1. lnstalI panel assembly AI; refer to task 26.
2. Install thermal system test controlIer; refer to para. 2-5, task 8.
3. Install thermal system test controller case cover; refer to volume 1, para. 4-8
TASK 20 ENDS HERE
ARR8224329
Volume IV
2-96
Para. 2-6, Task 20