TM 9-4931-381-14&P-2
F R A M E 4 5
Remove Meter:
NOTE
Refer to paragraph 2-4 on tagging and soldering wires
before doing any work.
1.
Unsolder two wires (1) from terminals (2).
2.
Unscrew and take off two screws (3), four washers (4), two Iockwashers (5), and nuts
(6) with screwdriver and wrench. Get rid of lockwashers (5) and turn in meter (7).
Install Meter:
3. Line upholes in new meter (7) with holes in structure (8).
4. Screw in and tighten two screws (3), four washers (4), two new lockwashers (5), and
nuts (6).
5. Solder two wires (1) to terminals (2).
Follow-on Maintenance:
1. Install Panel assembly A1; refer to task 26.
2. Install thermal system test controller; refer to para. 2-5, task 8.
3. Install thermal system test controller case cover; refer to volume 1, para 4-18.
TASK 21 ENDS HERE