T M 9 - 4 9 3 1 - 3 8 1 - 1 4 & P - 2
FRAME 26
Install Terminal Lug:
1.
Position new terminal Iug (1) with post (2) in place.
2.
Screw in two screws (3), new Iockwashers (4), and washers (5) with screwdriver and
bit. Torque screws between 6 and 7 pound inches (0.67 and 0.79 Newton meter).
3. Solder six wires (6) to terminal lug (1).
Follow-on Maintenance:
1. Install power module A6; refer to task 22.
2. Install thermal system test controller; refer para. 2-5, task 8.
3. Install thermal system test controller case cover; refer to volume 1, para. 4-18.
TASK 13 ENDS HERE
2-252
Volume IV
Para. 2-9, Task 13