T M 9 - 4 9 3 1 - 3 8 1 - 1 4 & P - 2
FRAME 28
Install Support:
1.
Peel backing off support (1) and position support (1) on enclosure (2).
2.
Put in and tighten screw (3), new lockwasher (4), washer (5), and nut (6) with
screwdriver and wrench.
3.
Put tiedown strap (7) around cables (8) and through support (1).
Follow-on Maintenance:
1. Install power control unit A6A1; refer to para. 2-10, task 2.
2. Install power module A6; refer to task 22.
3. Install thermal system test controller; refer to para. 2-5, task 8.
4. Install thermal system test controller case cover; refer to volume 1, para. 4-18.
TASK 14 ENDS HERE
Volume IV
Para. 2-9, Task 14
2-255