T M 9 - 4 9 3 1 - 3 8 1 - 1 4 & P - 2
FRAME 30
Install Enclosure:
1.
Position wiring harness (1) into enclosure (2).
2. Install tiedown strap (3) on wiring harness (1) and support (4).
Follow-on Maintenance:
1. Install
2. Install
3. Install
4. Install
5. Install
6. Install
7. Install
8. Install
9. Install
10. Install
11. Install
12. Install
power module base; refer to tosk 16.
terminal Iug; refer to task 13.
receptacle connector A6J5; refer to task 11.
power supplies PS1, PS2, PS3, and PS4; refer to task 17.
terminal boards; refer to task 18.
circuit card assembly A2; refer to task 19.
relay bracket; refer to task 20.
connector bracket; refer to task 21.
power control unit A6A1; refer to para. 2-10, task 2.
power module A6; refer to task 22.
thermal system test controller; refer to para. 2-5, task 8.
thermal system test controller case cover; refer to volume 1, para. 4-18.
TASK 15 ENDS HERE
Volume IV
2-258
Para. 2-9, Task 15