T M 9 - 4 9 3 1 - 3 8 1 - 1 4 & P - 2
/
FRAME 11
Install Bracket:
1.
Line up holes in bracket (1) with holes in holding fixture base (2) and leg (3).
2.
Screw in and tiqhten four machine screws (4), new lockwashers (5), and flat washers
(6) with screwdriver.
3.
Screw in and tighten two screws (7), new lockwashers (8), and washers (9) with
screwdriver.
Follow-on Maintenance:
1. Install toggle switch S1; refer to task
2. Install cable and cord assemblies; refer to task 11.
3. Install fan and rear fan guard; refer to task 12.
4. Install front vanguard; refer to task 13.
5. Install PCU holding fixture in accessory storage assembly; refer to volume 1.
para. 4-18.
6. install accessory storage assembly cover; refer to volume 1, para. 4-18.
TASK 9 ENDS HERE
Volume IV
3-50
Para. 3-7, Task 9