T M 9 - 4 9 3 1 - 3 8 1 - 1 4 & P - 2
FRAME 9
Install Riser Assemblies:
1.
Line up holes in riser assembly (1) with holes in new base plate (2).
2.
Screw in and tighten six screws (3), new lockwashers (4), and washers (5) with key.
3. Lineup holes in riser assembly (6) with holes in new base plate (2).
4. Screw in and tighten six screws (7), new lockwashers (8), and washers (9) with key.
NOTE
If tasks 1 through 4 were used to complete frame 8, do tasks
8 through 11.
Follow-on Maintenance: None
TASK 7 ENDS HERE
Volume IV
4-20
Para. 4-5, Task 7