TM 5-4520-244-14
4-24 BULKHEAD, SIDE PANELS AND CASING
This task covers:
Installation
c.
Removal
a.
In spection
INITIAL SETUP
Test Equipment
References
None
Materials/Parts
Equipment Condition
Serviceable replacement parts
Hood assembly removed
(procedure 4-12)
Personel Required
Engine removed
2
LOCATION
ITEM
ACTION
REMARKS
REMOVE
Remove screws (2)
Side panels
and washers (3).
Remove side panel (1)
Remove side panel (11)
Drill out rivet (4).
Information
Remove only if
Remove information
plate
damaged or illegible
plate (5)
INSPECTION
Inspect bulkheads (6) (7), information plates (9) (10) and casing (8) for
serviceable condition. Report damage, defect or worn out condition to
General Support Maintenance.
Inspect side panels (l), (11) and plate (5) for serviceable condition. If
.
damaged, defective or worn out, replace with a serviceable like item.
INSTALLATION
Information
Use l/2-inch pop
plate
rivets. Install
plates (5) on panels
(l), (11)
Side panels
Use screws (2) and
washers (3). Install
side panels on heater.
4-56