TM 5-4520-253-13
ELECTRICAL PROCEDURES INDEX
PROCEDURE
PAGE
Remove/Install Combustion Blower and Housing
Remove/lnstall/Test Thermal Motor Protector
Remove/lnstalI/Test Capacitors
Disassemble/Assemble/Test Blower Motor
Repair Blower Motor
Remove/Install Ventilating Air Motor
Test Ventilating Air Motor
Test Ventilating Air Motor Capacitor
4-40
4-44
4-46
4-47
4-51
4-53
4-58
4-60
R E M O V E / l N S T A L L C O M B U S T I O N B L O W E R A N D H O U S I NG
TOOLS: Tool kit, service, refrigeration unit
NSN 5180-00-596-1474
Solder gun kit
NSN 3439-00-930-1638
MATERIALS/PARTS: Solder (Item 12, Appendix E)
GENERAL SAFETY INSTRUCTIONS:
Power off.
Heater cool.
REMOVAL:
Death or serious injury could occur if precautions are not
taken when maintaining this equipment. Position HEATER-
OFF-FAN switch to OFF, remove power cable plug from
POWER RECEPTACLE, and ground capacitors C1 and C2
prior to gaining access to heater compartments. Terminals
of capacitors are accessible at end cover of combustion
blower. Always disconnect power cable before making con-
tinuity tests or before repairing heater. Always have
another person standing by who is trained in electric shock
first aid.
Allow sufficient time for heater to cool to room tempera-
ture before gaining access to heater compartments.
1.
Remove six screws (1) and lock washers (2) and lift off bottom cover (3).
4-40