TM 5-4520-253-13
REMOVE/lNSTALL/TEST THERMAL MOTOR PROTECTOR (CONT)
INSTALLATION:
1. Connect leads (5) of motor protector (2) to wires (3 and 4) using new butt connectors (6).
2. Attach motor protector (2) to field coil (7) using two new cable ties (1).
3. Completely encase motor protector (2) and cable ties (1) with MlL-A-46106 sealant. Allow
sealant eight hours to harden.
TESTING:
1. Disconnect thermal motor protector leads (5). Test at room temperature using volt ohmmeter.
2. With probes contacting motor protector leads (5), meter should read zero resistance. If meter
indicates resistance, replace motor protector (2).
4-45