T M 9 - 4 9 3 1 - 3 8 1 - 1 4 & P - 2
FRAME 15
Install Contact:
1.
Put new contact (1) in connector (2).
2.
Connect wire (3) to contact (1) with wire wrap tool.
Follow-on Maintenance:
1.
2.
3.
4.
5.
6.
TASK
Install plate; refer to task 17.
Install digital subsystem assembly A3; refer to task 18.
Install circuit card assemblies A2, A3, A4, A5, A6, A7, A9, A10, A13, and A14;
refer to task 19.
Install
Install
Install
electrical cardholder; refer to task 20.
thermal system test controller; refer to para. 2-5, task 8.
thermal system test controller case cover; refer to volume 1, para. 4-18.
13 ENDS HERE
2-144
Volume IV
Para. 2-7, Task 13