T M 9 - 4 9 3 1 - 3 8 1 - 1 4 & P -2
FRAME 13
Remove Clip and Holder:
l
Use this task to
l
Read paragraph
work.
NOTE
replace any of 28 clips and holders.
2-4 on replacing rivets before doing any
Soldier A:
1. Take out two tubular rivets (1) from clip (2) and holder (3).
Soldier A:
2. Take of clip (2) and holder (3).
Install Clip and Holder:
Soldier A:
3. Line up new clip (2) and holder (3) with holes in digital card cage
assembly (4).
Soldier A,
Soldier B:
4. Put new rivet (1) through clip (2) and holder (3).
Follow-on Maintenance:
1. Install plate; refer to task 17.
2. Install digital subsystem assembly A3; refer to task 18.
3. Install circuit card assemblies A2, A3, A4, A5, A6, A7, A9, A10, A13, and A14;
refer to task 19.
4. Install electrical card holder; refer to task 20.
5. Install thermal system test set controller; refer to para. 2-5, task 8.
6. Install thermal system test controller case cover; refer to volume 1, para. 4-18.
TASK 12 ENDS HERE
Volume IV
Para. 2-7, Task 12
2-141