T M 9 - 4 9 3 1 - 3 8 1 - 1 4 & P -2
FRAME 11
Remove Isolation Wall:
NOTE
Read paragraph 2-4 on replacing rivets before doing any
work.
Soldier A: 1.
Soldier A: 2.
Install Isolation
Soldier A: 3.
Soldier A,
Soldier B: 4.
Take out four tubular rivets (1) from isolation wall (2).
Lift isolation wall (2) out of card cage
wall:
Line up rivet holes (4) in new isolation
card cage (3).
Put in four new rivets (1).
(3).
wall
Follow-on Maintenance:
1. Install terminal board; refer to task 16.
2. Install plate; refer to task 17.
3. Install digital subsystem assembly A3; refer to
4. InstaIl circuit card assemblies A2, A3, A4, A5,
refer to task 19.
5. Install electrical card holder; refer to task 20.
task
Turn in isolation wall (2).
(2) with holes (5) in digital
8.
A6, A7, A9, A10, A13, and A14;
6. Install thermal system test controller; refer to para.2-5, task 8.
7. Install thermal system test controller case cover; refer to volume 1, para. 4-18.
TASK 10 ENDS HERE
Volume IV
Para. 2-7, Task 10
2-137