T M 9 - 4 9 3 1 - 3 8 1 - 1 4 & P - 2
FRAME 16
Install Center Plate:
NOTE
Read paragraph 2-4 on replacing rivets before doing any
work.
Soldier A:
1. Position center plate (1) between guide supports (2) so that plain self-
locking nuts (3) on center plate (1) are toward isolation wall (4). Lineup
rivet holes (5) in center plate (1) with holes (6) in supports (2).
Soldier A,
Soldier B:
2. Put in eight new rivets (7).
Follow-on Maintenance:
1. Install terminal board; refer to task 16.
2. Install plate; refer to task 17.
3. Install digital subsystem assembly A3; refer to task 18.
4. Install circuit card assemblies A2, A3, A4, A5, A6, A7, A9, A10, A13, and A14;
refer to task 19.
5. Install electrical card holder; refer to task 20.
6. Install thermal system test controller; refer to para. 2-5, task 8.
7. Install thermal system test controller case cover; refer to volume 1, para. 4-18.
TASK 14 ENDS HERE
Volume IV
2-146
Para. 2-7, Task 14